News
2006
The new FRP product line!

 


 

 

 

 

 

 

During 8 months we have, as a fast track, developed a complete new product line in FRP material (fibre reinforced plastic).

The system is unique on the market. (See picture) All main items are pultruded, a continuous process of roving or roving bundles, which are drown through a resin impregnated bath to coat the fibres with a specially formulated resin mixture.

The new system consists of ladders and trays. The ladder system has 3 different types, 75, 100 and 150 mm heights. The trays are in 2 types, 50 and 80 mm heights.
The products can be delivered as standard in 3 versions (resins). The stocked one is polyester, and that will be delivered with all kind of accessories and connecting parts.

The ladder systems are unique on the market since it has many new and improved details, such as the fixing of the rungs to the side profiles. See picture.

The shape of the profiles has some advantages compared to competitors. Due to the shape of the ladder profile, the ladder FOE 150 are tested and approved according to NEMA 20C, the highest class for ladder systems. All ladders have perforated rungs, which make it possible to use all kind of cable fixings, straps, bands etc. Both ladders and trays are developed so that Oglaend Systems tube clamps (ETIN) fits the product. Oglaend Systems SmartCleat for trefoil installation of high voltage cabels also fits the ladder system.

Many of the details and advantages are protected, either by patent or copyrights.

The Oglaend Group has at the same time established a daughter company in Dubai, which will take care of all the companies’ activities in the Middle East region. That includes sale and marketing of the total product range, as well as fabrication and assembly work of the FRP-product.

Read more

 

Contracts until April 2006
This year have also started good for the firm and we have so far this year signed the following large contracts:
Country Customer Project Type of material Yard/ Constructor

Sweden Vägverket Norrortsleden
stage 1
LOE55 og LOE75 all in SS El og Industrimontage Svenska AB
Sweden Vägverket Götatunnellen Göteborg LOE55 og TOE100 all in SS YIT


PREVIOUS
NEWS FROM OGLAEND SYSTEM:

         2006 : The new FRP product line 
         2005 : Contracts in 2005
         2004 : Contracts in 2004
27.02.2003 : The Snohvit-contract has been awarded Oglaend System
10-02.2003 : Oglaend System introduces the Smart BoxTM
06.01.2003 :
White Rose FPSO
01.01.2003 :
New projects to be supplied by our UK subsidiary
10.12.2002 : Norsk Hydro's Grane project
27.11.2002 : Oglaend System introduces the Smart Cleat™
29.10.2001 : Three new UK based contracts
05.02.2001 : Cable ladders for Södra lanken - Stockholm
05.02.2001 : Kim chuan project
05.02.2001 : Shipments to Bayu undan
05.02.2001 : Contract with Kvaerner Philadelphia
05.02.2001 : Halliburton
05.02.2001 : Support equipment to the worlds longest tunnel
05.02.2001 : Subsidiaries
12.08.2000 : New contracts
24.01.2000 : Stronger focus on onshore products and services
15.01.2000 : Engineering service

 


2003 © Oglaend System a.s
News
03.07.2008
Visit us at D402 at ONS 2008.

21.02.2007
Introducing MultiGrid Small Bore
Pipe (<2”) Support System

more »


 
Other