MultiGrid™ For Ships
The principle of MultiGrid™ is to support all disciplines with fixing points where and whenever needed, whatever purpose.
Standard support for ships
1: To be fixed by fabricator: Only the welding channels are fixed in the construction yard.
- Welding channels are supplied in carbon steel (CS) and to be painted together with the hull.
- The channels are welded to the ceiling above the equipment route.
- The channels are installed in lengths of 1,5 m in parallel with the stringers with 2 m distance between them.
- Channels of 0,6 m lengths are installed between the stringers (se illustration).
- These will also function as stiffeners for the stringers
- Please note: No cable ladders are installed at the construction site because of the risk of equipment changes.
2: To be fixed by installation contractor
- Hot Dip Galvanized cable ladders to be fixed to the channels with bolts and brackets.
- The channels provide fixing points throughout the route.
- There is no need for repainting, and the installation of cables can start immediately.
- Small pipes and other equipment can be installed using the same fixing points.
- The flexibility makes it easy to reroute equipment, making this a very cost effecient solution.
Simplified support for ships
1: To be fixed by fabricator: Only welding brackets are installed in the construction yard.
- The welding brackets are supplied in carbon steel (CS) to be painted together with the hull.
- The brackets are welded to the ceiling above the equipment route.
- The placing of the brackets is depending on the width of the planned cable ladder.
- The distance between the brackets along the length of the cable ladder should be roughly 2 m.
- Please note: No cable ladders are installed at the construction site because of the risk of equipment changes.
2: To be fixed by installation contractor
- Hot Dip Galvanized cable ladders are fixed to the brackets with bolts.
- There is no need for repainting and the installation of cables can start immediately.
- Small pipes and other equipment can be installed using the same fixing points.
- The brackets can be extended 300 mm splice channels or perforated UNO channels.
- The brackets combined with channels give fixing points throughout the equipment route.
- Please note: No cable ladders are installed at the construction site because of the risk of equipment changes.
Please see our catalogue for more details.