This installation method makes it easy to reconfigure the whole equipment area throughout the project’s entire lifetime. By using the MultiGrid® concept the customer saved both time and cost on the project.
Clair Ridge safely started production in November 2018, targeting 640 million barrels of recoverable resource and peak production of 120,000 barrels of oil a day. The multi-billion-pound investment by BP and partners is designed to continue producing until 2050.